New Work Begins: Excavation

Well, it has been a few months since we had any work done on the house. Beth has been coordinating the work that we planned for before I left, and I'll have a few postings from the pictures she sent to me. The plan for this new phase was to have some excavation completed before we started on the exterior. This includes having a new line dug and installed for our waste spectic tank; French drains along the backside of the house to divert ground water; a new slave cistern for our household water; a stairwell into the basement; the driveway graded and new crushed stone laid; and flexible water line we'll need that will go from the outdoor wood furnace into the house.


Gravel and grading of the driveway












Plex line to the future outdoor wood furnace location












New slave water cisturn












Location of the new outdoor stairwell to the basement












New septic waste line from the house to septic tank

Comments

Popular Posts